Project Name: Soda Ash Plant Pipeline Project
Location: Zhambyl Region, Kazakhstan
Required Tonnage: 2,300 tonnes
Application: Primarily used for the external pipeline network of a soda ash plant, facilitating the transport of materials and media as well as interconnecting plant-site piping.
Pipeline Technology: ERW (High-Frequency Electric Resistance Welded) steel pipe; industrial transport pipeline system application.
Anti-corrosion: 3PE coating (2.2 mm) and FBE coating (300 μm) (dual-layer composite anti-corrosion system to enhance corrosion resistance in buried and industrial environments).
Project Overview:
This project is part of the construction of a soda ash plant in the Zhambyl Region of Kazakhstan, specifically serving the external pipeline transport network.
The project utilizes API 5L X52M ERW steel pipes featuring a dual anti-corrosion system (3PE + FBE) to ensure long-term, stable operation in complex industrial environments and buried conditions.
CAMCE is responsible for the overall engineering execution and construction.
Project Challenges:
High requirements for anti-corrosion systems in industrial chemical projects.
Complex process control for the dual-layer anti-corrosion system (3PE + FBE).
Strict requirements for welding consistency in large-diameter ERW pipelines.
High demand for coordination between the project execution team and construction crews (EPC model).
The client expressed satisfaction with the overall project execution, particularly acknowledging the product’s stable performance in a complex industrial environment.
Client feedback highlighted:
Excellent performance of the pipeline anti-corrosion system (3PE + FBE), effectively enhancing long-term corrosion resistance.
High dimensional accuracy and consistent welding quality of the ERW steel pipes.
Supply schedule aligned well with the project’s construction pace.
Professional and reliable performance by CAMCE in project execution and on-site coordination.